Lite kuriosa jag hittade om Aurcana och dotterbolaget i den löpande bevakningen. Full fart m a o.
En sak ska man veta om Kanada börsen och det är att det alltid läcker info. De senaste dagarnas kursutveckling kan ni med tämligen hög säkerhet ta som bevis för att även om dom skulle ha haft problem med krossen så har det knappast varit något allvarligt. Men vi får reda på mer under conf call den 20e.
Det ser ut som man måste ringa in själv dvs ännu så länge har jag inte sett någon internet länk. Personligen brukar jag ta det via Skype som ger mig lokalsamtal.


Date: Monday, August 20, 2012

Time: 2:00 PM EDT (11:00 AM Pacific)

Attendee Access Information:

1-800-319-4610 Canada and USA Toll-free

604-638-5340 Vancouver

1-604-638-5340 Outside of Canada & USA

A replay of the conference call will be available immediately following the conference by dialing 1-800-319-6413 in Canada & USA (Toll-free) or 1- 604-638-9010 outside of Canada and USA. The required pass code is 2729 followed by the # sign.

Please dial-in to the meeting at least 5 minutes prior to the start time using one of the attendee phone numbers.

1 kommentar:

  1. Tydligen har Aurcanas Q2 reultat läckt ut:

    "18% increase in milled tonnes processed for a total of 307,161 milled tonnes during the six months ended June 2012, (2011: 260,931 tonnes); of which 45,588 milled tonnes or 15% were mined from NI 43-101 Measured and Indicated resources and the balance of 261,573 milled tonnes or 85% were mined from non 43-101 compliant resources;
    La Negra Mine in Mexico completed its second consecutive mill expansion from a capacity of 1,500 tonnes per day (tpd) to 2,500 tpd on time and on budget in April 2012. The planned milling rate is 2,000 tpd and La Negra continuously exceeded the planned rate in Q2, 2012.
    Shafter Silver Mine in Texas commissioning and testing of the processing plant continues. As a result of the testing to date, two key areas have been identified for improvement; further mine development and the processing plant mill dewatering.
    The underground production will be supplemented by a test open pit until fourth quarter of 2012 as further development is required in order to sustain 1,500 tons per day. Further development of the underground mine is currently under review.
    During the second quarter, the deferred stripping of a small test open pit was started. The mineralized rock is expected to be processed starting in late August.
    Resulting from the commissioning test in Q2, the dewatering process of the processing plant is currently being re-configured. The processing plant continues testing to reach 1,500 tons per day as anticipated, and will be ready in the fourth quarter 2012.
    The Company had earnings from La Negra mining operations of $5.5 million for the quarter ended June 30, 2012 (2011: $5.3 million); income before taxes of $2.0 million (2011: $1.7 million); a net income of $1.4 million (2011: $ 1.6 million). For the six months ended June 30, 2012 the Company had earnings from mining operations of $ 11.0 million (2011: $ 10.7 million); income before taxes of $ 4.6 million (2011: $ 3.3 million); a net income of $ 3.4 million (2011: $ 2.3 million). The increase in earnings from La Negra mining operations for the quarter ended June 30, 2012 as well as for the six months ended June 30, 2012 was mainly related to increased volumes sold and the increase in the higher grades of the metals in the concentrates produced by the Company in spite of lower metal prices."

    MVH